Incheon Unbuk STPview Pure Envitech
Application:
Municipal
SBM − Pure Envitech
About Incheon Unbuk STP
Commissioned/installed date: 2012
Incheon Unbuk Sewage Treatment Plant is operated using the A2O method to remove SS as well as nutritive salts from the wastewater, at a capacity of 12,000m3/day.
The existing treatment plant needed improvement to follow water treatment policy change such as enhanced designed inflow water quality standard as well as effluent water quality standard. The DF−MBR process with 11,000m3/day capacity was built, which increased the total capacity up to 23,000m3/day.
- pdf_case_study_pure_envitech_incheon_unbuk_stp (PDF 479KB)
Company summary
About this page
This page was last updated on 19 June 2018
Disclaimer
Information on this page may have been supplied by third parties. You are reminded to contact any third parties to confirm information is accurate, up to date and complete before acting upon it. TheMBRSite.com accepts no liability for information provided by third parties, actions taken on the basis of this information or information held on third-party websites.