You say you want the resolution ..

18 August 2011


Simon Judd

Simon Judd

Author Bio

Simon Judd, author of The MBR Book, Watermaths, and Industrial MBRs, offers observations on membrane technology. Contact Simon at simon@juddwater.com.

It is recognised that MBRs – and the immersed configuration (iMBR) in particular – operate more efficiently when fluctuations in loading are reduced. If the option is available, and this normally means space, a buffer tank can reduce fluctuations sufficiently to allow more optimal use of the membranes, and a cost analysis (see https://www.box.net/shared/4mj2ij5adg) has shown this to be slightly more cost effective than installing additional membranes for large municipal installations.

However, the costs incurred by very large peak loads can become very significant, particularly if space is at a premium and recourse has to be made to installing large amounts of membrane, which are then underutilised during periods of low flows. This underutilisation can to some extent be mitigated by reducing the energy demand by switching to either more intermittent aeration (for HF membranes) or reduced bulk aeration (for FS membranes) in the case of iMBRs. For sMBRs the number of membranes on line can be reduced directly without altering the permeation conditions at all, which then means that the unused membranes can effectively be used as spares.

So, whilst extreme peak loads are unwelcome for any membrane process, and inevitably adds to the capital cost through requiring additional membranes to be installed, it seems that there are ways of adapting the conditions to limit the increase in specific energy demand (kWh/m3 permeate) normally associated with low flows. Indeed, for the air-lift sidestream in particular, it is actually technically possible (though obviously not practically feasible) to match the number of membrane modules on line with the flow. For a medium to large plant with over 100 modules, this equates to a resolution of <1%. And then we’d have to start improving the precision of the flow monitoring equipment …

‘The MBR Site’ is a trading division of Judd and Judd Ltd, a company registered in England and Wales, registered number 8082403.

Registered office: Suite 2, Douglas House, 32-34 Simpson Road, Fenny Stratford, Buckinghamshire, MK1 1BA, United Kingdom. Email: info@thembrsite.com

Banner image: full treatment plant for pharmaceutical wastewater in Taizhou, Linhai Park, Zhejiang Province, China, including Shanghai MEGAVISION  flat sheet UF membrane modules in two MBR units. Image courtesy of VALORSABIO, Lda.

Image credits:

– Image for our Chinese largest plants 全球最大的MBR项目 homepage link: Image supplied by Apex Environmental
– Image for our Consultants and Contractors homepage link: Image supplied by Ovivo USA, LLC.

Disclaimer: The information given on this website is reproduced in good faith. No liability is accepted for errors or omissions. The MBR Site does not endorse any products, services, organisations, events or any other listing included in this site. You are strongly advised to check all information, including specifications and installation details, before acting on any information given in this website. The MBR Site links to third-party websites – note that we are not responsible for the content of third-party websites and third-party websites are visited at your own risk. Please read our terms and conditions and privacy policy. Use of this website indicates acceptance of these conditions.

This website is designed for modern browsers – if you have problems viewing our website, you may wish to upgrade your browser.