Biotreatment process configurations

The contaminant removal achieved by any biological process is dependent on whether oxygen is present, and in what form. Aerobic processes require dissolved oxygen to convert organic carbon to carbon dioxide and ammonia to nitrate (nitrification). These both represent biochemical oxidative ‘aerobic’ processes.

In the absence of dissolved oxygen, organic carbon may still be oxidised if an alternative source of oxygen is present – from an oxyanion and specifically from nitrate (NO3-). This then presents a means of removing nitrate, a nutrient, from the wastewater.

Nitrate formed from nitrification of ammonia can be converted to nitrogen gas by biochemical reaction with organic carbon, a process known as ‘denitrification’. This can only take place if dissolved oxygen is absent but nitrate is present – conditions described as ‘anoxic’.

Returning the treated nitrate-rich sludge to an anoxic zone in front of the aerobic treatment step thus allows the nitrate to be removed, a process modification known as the ‘Modified Ludzack-Ettinger’ (MLE) process. A combination of aerobic nitrification and anoxic denitrification permits most of the ‘total nitrogen’ (TN) to be removed.

If there is no source of oxygen to allow any biochemical reaction with the organic carbon to take place – either from oxygen or oxyanions – then the conditions are described as ‘anaerobic’. In the treatment of municipal wastewater, anaerobic conditions are applied as a treatment step in assisting the removal of phosphate from the water. Biological phosphorous removal (BPR) in this manner proceeds through recirculation of the sludge to an anaerobic zone. This promotes phosphate removal in two ways:

i) by encouraging the phosphate to be taken by the biomass (the microbiologically active component of the sludge), and

ii) releasing the biological phosphate as inorganic phosphate, which can then be removed by chemical precipitation.


‘The MBR Site’ is a trading division of Judd and Judd Ltd, a company registered in England and Wales, registered number 8082403.

Registered office: Suite 2, Douglas House, 32-34 Simpson Road, Fenny Stratford, Buckinghamshire, MK1 1BA, United Kingdom. Email: info@thembrsite.com

Banner image: full treatment plant for pharmaceutical wastewater in Taizhou, Linhai Park, Zhejiang Province, China, including Shanghai MEGAVISION  flat sheet UF membrane modules in two MBR units. Image courtesy of VALORSABIO, Lda.

Image credits:

– Image for our Chinese largest plants 全球最大的MBR项目 homepage link: Image supplied by Apex Environmental
– Image for our Consultants and Contractors homepage link: Image supplied by Ovivo USA, LLC.

Disclaimer: The information given on this website is reproduced in good faith. No liability is accepted for errors or omissions. The MBR Site does not endorse any products, services, organisations, events or any other listing included in this site. You are strongly advised to check all information, including specifications and installation details, before acting on any information given in this website. The MBR Site links to third-party websites – note that we are not responsible for the content of third-party websites and third-party websites are visited at your own risk. Please read our terms and conditions and privacy policy. Use of this website indicates acceptance of these conditions.

This website is designed for modern browsers – if you have problems viewing our website, you may wish to upgrade your browser.